Breakthru Beverage

  • Breakthru Beverage Nevada (20)- web
  • Breakthru Beverage Nevada (19)- web
  • Breakthru Beverage Nevada (18)- web
  • Breakthru Beverage Nevada (17)- web
  • Breakthru Beverage Nevada (16)- web
  • Breakthru Beverage Nevada (15)- web
  • Breakthru Beverage Nevada (24)- web
  • Breakthru Beverage Nevada (23)- web
  • Breakthru Beverage Nevada (22)- web
  • Breakthru Beverage Nevada (21)- web
Description:

The project at Breakthru Beverage in Las Vegas, NV consisted of a complete removal and replacement of approximately 12,577 square feet of failed asphalt, including 526 linear feet of cracks 1 inch or wider. Around 6,750 linear feet of 1/4 inch cracks were crack filled. Two coats of MTR Master-Seal were applied over about 349,863 square feet. Finally, the area was re-striped to the original plan.

 

Owner:
Breakthru Beverage
Location:
Las Vegas, NV