Projects
Coca Cola

Description

This project required numerous Sunland systems and applications. The job consisted 8379 square feet of heavy duty asphalt patching, 850 square feet of concrete flatwork, 52 lineal feet of concrete curb remove and replace, repair of a concrete retaining wall with installation of a 30 lineal foot railing, removal of three trees, 11,900 square feet of grading and paving, crack sealing over 200,911 square feet, two coat sealcoat over 200,911 square feet and restriping the entire facility.

Owner

Coca Cola Refreshments

Location

Albuquerque, NM

Heavy Duty Asphalt Patching Company
Asphalt Grading and Paving for Coca Cola
Sunland Asphalt Sealcoating in New Mexico
Asphalt Repair Services