Windy Walk Estates

  • Windy Walk Estates HOA - Paving (209)-web
  • Windy Walk Estates HOA - Paving (207)-web
  • Windy Walk Estates HOA - Paving (205)-web
  • Windy Walk Estates HOA - Paving (204)-web
  • Windy Walk Estates HOA - Paving (201)-web
  • Windy Walk Estates HOA - Paving (199)-web
  • Windy Walk Estates HOA - Paving (197)-web
  • Windy Walk Estates HOA - Paving (196)-web
  • Windy Walk Estates HOA - Paving (195)-web
  • Windy Walk Estates HOA - Paving (193)-web
  • Windy Walk Estates HOA - Paving (192)-web
  • Windy Walk Estates HOA - Paving (191)-web
  • Windy Walk Estates HOA - Paving (189)-web
  • Windy Walk Estates HOA - Paving (187)-web
  • Windy Walk Estates HOA - Paving (186)-web
  • Windy Walk Estates HOA - Paving (185)-web
Description:

This project required prelowering 94 manholes and 7 water valves, as well as locating 82 existing survey monuments in preparation for future replacement. We then milled 38,128 square yards to a depth of 2.50 inches. Fine grading, moisture conditioning and compacting were required for the 38,128 square yards of existing grade. Sunland then paved 38,128 square yards to a depth of 2.50 inches. Existing utilities were adjusted and raised to match new asphalt elevation. All 82 survey monuments were replaced and installed to complete the project.

Owner:
Frank Civil Consulting
Location:
Scottsdale, AZ 85255