Yuma Road Improvements, Apache Road to 247th Avenue

  • Underground Utilities Arizona Project
  • Buckeye Yuma Road (2) - sm
  • Buckeye Yuma Road (5) - sm
  • Yuma Road Improvements - Buckeye (41) - sm
  • Yuma Road Improvements - Buckeye (45) - sm
Description:

This project reconstructed 1/2 mile of the 2-lane roadway to add a continuous center turn lane and dedicated right turn lanes. The work included excavation and grading, water and sewer main installation, storm drain system, curb and gutter, sidewalk, asphalt paving, street lighting and electrical / ITS /Century Link/ Cox duct bank.

Owner:
Jones Brothers Investment
Location:
Buckeye, AZ
Location:
Buckeye, AZ