This project required mostly concrete remove and replace to take care of safety issues. A concrete ADA ramp was also added at this Lowes. The project consisted of 1,150 square feet of concrete side walk, 430 lineal feet of curb and gutter, the handicap ramp and 722 square feet of asphalt remove and replace.
Lowes
Rio Rancho, NM
Copyright 2022 • Sunland Asphalt & Construction, LLC
Copyright 2022
Sunland Asphalt & Construction, LLC